Kumkoy Hydropower

Kumkoy Hydroelektric Power Plant, Samsun

Kumkoy Hydroelectric Power Plant, Samsun (Kumkoy HPP, Samsun) is a true run -off river type project with 17.50 MW capacity. The project is expected to produce 49,205 tonnes of Social Carbon labeled VCUs each year.

Project Type:

Alternative Energy

Location:

Jilin Province, China

Estimated Annual Emissions Reduction:

49,037

Verification:

Verra Verified Carbon Standard

REDUCE YOUR EMISSIONS BY UP TO 30%

Without doing anything differently, just pump your gas and know that every time you fill up with Circle K Conserve, you’re helping to invest in carbon reduction projects. These important efforts are designed to pull carbon dioxide out of the atmosphere, impacting our local communities and communities across the world.