Wayang Windu Phase 2 Geothermal Power Project
Wayang Windu Phase 2 Geothermal Power Project, is a 117MW geothermal power station, which is an additional power unit to an existing grid-connected renewable power plant. The Project activity is the generation of power using a reliable and renewable resource in place of power generation by a more greenhouse gas intensive fuel/source. The project reduces greenhouse gas emissions through the displacement of fossil fuel electricity generation with a clean, renewable energy source.
Project Type:
Geothermal
Location:
Indonesia, West Java
Estimated Annual Emissions Reduction:
794,832
Verification:
Verra Verified Carbon Standard
REDUCE YOUR EMISSIONS BY UP TO 30%
Without doing anything differently, just pump your gas and know that every time you fill up with Circle K Conserve, you’re helping to invest in carbon reduction projects. These important efforts are designed to pull carbon dioxide out of the atmosphere, impacting our local communities and communities across the world.